PROJECT DESCRIPTION
This was a challenging project, both because it was a brownfield project and because it was executed during the COVID 19 pandemic.
Scope
Engineering, procurement, construction, assembly, and commissioning of the required works to expand the industrial facilities of Estação Fazenda Alegre, including Three-Phase Separation System, Oil Cooling System, Water Treatment- Chemical Injection, Tank Storage and Pump Injection Station for Disposal and new CCM
WATCH THE VIDEO
PROJECT DETAIL
- Client: Petrobras.
- Location: Jaguaré, ES
- Instalation period: 16 months