PROJECT DESCRIPTION
This is an important project for Brazil because it provides a completely new approach to gas monetization: monetization on site.
Escope
Engineering, supply, installation and assembly, commissioning, start-up, operation and maintenance of the Natural Gas Treatment System, including natural gas wells, 54km pipelines, manifold, metering system, three-phase separation (gas, water and condensate), water injection, storage and condensate loading system and delivery point.
WATCH THE VIDEO
PROJECT DETAILS
- Client: Paraníba Gás Natural SA
- Location: Santo Antônio dos Lopes, MA
- Start in: November 2011
- Installation Period: 12 months in the first phase of the project.
- Operating Capacity: 6 MMm³ per day with completed expansion to 8.8 MM m³ per day in 2014.