ABOUT

Geogas has acquired renown in the construction, operation and maintenance services of onshore pipelines and delivery points. In the Parnaíba Natural Gas Treatment System, Geogas was responsible for the construction and assembly of 54km of gas pipelines designed to operate at low and high pressure. Additionally, Geogas installed the delivery point for measuring the specified gas.

WHAT WE DO

  • EPC of Onshore Pipelines and Delivery Point;
  • Operation, Maintenance and Guarantee of Integrity of Pipelines.

image
image
image
image